PHOTO GALLERY

Pressure Vessels & Heat Exchangers.

Rubber lined Vessel

Rubber lined Vessel

Trap

Trap

Heat Exchanger

Heat Exchanger

Heat Exchanger

Heat Exchanger

Heat Exchanger

Heat Exchanger

CS U-Tube Bundle Assembly

CS U-Tube Bundle Assembly

Sulfur Converter

Sulfur Converter

Sour Water De-gassing Drum

Sour Water De-gassing Drum

Sea Water Sand Filter Under Installation

Sea Water Sand Filter Under Installation

Rich Amine Flash Drum

Rich Amine Flash Drum

Refrigerant Accumulator (Div. 2 Vessel)

Refrigerant Accumulator (Div. 2 Vessel)

Refractory Lined Sulfur Converter

Refractory Lined Sulfur Converter

Raw Pyrolysis Gasoline Drum

Raw Pyrolysis Gasoline Drum

Propane Caustic Prewash (Div. 2 Vessel)

Propane Caustic Prewash (Div. 2 Vessel)

Medium Pressure Separator

Medium Pressure Separator

LTCS Refrigerant Accumulators

LTCS Refrigerant Accumulators

LPG Storage Tank

LPG Storage Tank

Low Pressure Production Trap (B34-D-0204)

Low Pressure Production Trap (B34-D-0204)

Low Pressure Production Trap (B33-D-0204)

Low Pressure Production Trap (B33-D-0204)

Internally Glassflake Lined Vessel

Internally Glassflake Lined Vessel

HPPT (B32-D-0201) Ready For PWHT

HPPT (B32-D-0201) Ready For PWHT

High Pressure Production Trap (B32-D-0201)

High Pressure Production Trap (B32-D-0201)

High Pressure Production Trap (B32-D-0201)

High Pressure Production Trap (B32-D-0201)

High Pressure Production Tram

High Pressure Production Tram

Fresh Ethane Knock-Out Drum

Fresh Ethane Knock-Out Drum

Degassing Drum

Degassing Drum

De-Propanizer Reflux Drum

De-Propanizer Reflux Drum

De-Ethanizer Reflux Drum (Div. 2 Vessel)

De-Ethanizer Reflux Drum (Div. 2 Vessel)

CS Vessels For Petro-Rabigh Project

CS Vessels For Petro-Rabigh Project

CS Vessel for JGC

CS Vessel for JGC

CS Air Receiver

CS Air Receiver

Cold LP Separator

Cold LP Separator

C3R 2nd Stage Suction Drum

C3R 2nd Stage Suction Drum

ASME Div. 1 and Div. 2 Vessels Under Installation

ASME Div. 1 and Div. 2 Vessels Under Installation

ASME Div. 1 and 2 Vessels Under Installation

ASME Div. 1 and 2 Vessels Under Installation

AMINEX Contactor (Div. 2 Vessel)

AMINEX Contactor (Div. 2 Vessel)

50 mm Thick Sulfur Adsorber

50 mm Thick Sulfur Adsorber

50 mm Thick Sulfur Adsorber Under Erection

50 mm Thick Sulfur Adsorber Under Erection

50 mm Thick Green Oil Separator

50 mm Thick Green Oil Separator